← Back to results
Tender Document on Design, Supply, Installation, Testing, Commissioning, and 5 years CMC for capacity of 10kWp Off-Grid SPY Power Plant at 11 (Eleven) Permanent
Original document only
We could not extract the text of this document, so there is no summary. The original is below — please read it directly.
Original document (cached copy)
Our copy of the official file. Always confirm against the government host.