← Back to results
Notice
Notices from this portal

Parameters Permissible limits before discharge into sewer without terminal STP or not connected to public sewers Permissible limits before discharge into public

Punjab Pollution Control Board (PPCB), PunjabIndexed 16 Aug 2026fetched 16/8/2026, 11:13:11 am
Open official source ↗Share on WhatsAppTranslate this page
AI summary — verify with original
Parameters Permissible limits before discharge into sewer without terminal STP or not connected to public sewers Permissible limits before discharge into public sewers with terminal STP (General standards as per EPA, 1986) pH 6.5-9.0 5.5-9.0 Suspended Solids 100 mg/l 600 mg/l Oil & Grease 10 mg/l 20 mg/l BOD 30 mg/l 350 mg/l COD 250 mg/l - Bio-assay 90% survival of fish after 96 hrsin 100% effluen (Extractive summary — verify with official source.)
Document (our cached copy)

Not an official government host — verify, then open the official source.

Parameters Permissible limits before discharge into sewer…