Commissioning Certificate of Biogas Project for biogas plant above 25 to 2500 M 3 ) (on Letterhead of the PIA) Reference: MNRE Administrative Sanction No

Biogas Application PortalIndexed 16 Aug 2026fetched 16/8/2026, 1:22:04 am
Open official source ↗Share on WhatsAppTranslate this page
AI summary — verify with original
Commissioning Certificate of Biogas Project for biogas plant above 25 to 2500 M 3 ) (on Letterhead of the PIA) Reference: MNRE Administrative Sanction No.------- Dated: --- It is certified that a Biogas Power Generation (Off-grid/ Grid)/ Thermal Energy application plant of ------KW(KVA) / -------Cubic metre Capacity per day has been installed at the premises of Shri/ Smt. (Name of the Beneficiary) (Extractive summary — verify with official source.)